The following pictures of P S Monarch show the work being undertaken to return the steamer to servicesailing from Wareham
The boiler is due back within
the next month from being overhauled and repaired with new tubes fitted.
The engine is currently being
modified so as the main drive shaft also drives the Water Feed Pump and Air
Pump. These will save the need for an on board diesel generator which was used
previously.
An alternator with drive from
the main engine has been fitted. This will charge the batteries that will drive
the bow and stern thrusters and lighting throughout the vessel.
A new bow thruster has been
fitted as the previous one was seized.
The saloon has been repaired
and new glazing fitted and is currently being painted.
A WC is in the process of
being fitted, the type used in a camper van.
Various modifications have
been made to the deck and deck plates with a drainage system, in an attempt to
reduce water ingress into the bottom of the hull.
It is hoped the vessel will be
ready to go into service in early May 2013 and it is Planned to offer cruises down
the River Frome from Wareham just to where the river enters Poole Harbour.
All photogtaphs taken by Chris Phillips from Swanage